?Calendar calendar calendar calendar's later work can be divided into two parts, covers fabrication and bracket fabrication.

Cover production process can be divided into three steps:First, the cover UV, refers to the cover surface coating (or spray, or printed) on a layer of colorless and transparent coating, which cover the surface of the thin uniform layer of transparent light. Can protect the contents of the printed

calendar, but also play a beautiful role. Can play a more gloss to print, the visual effect is remarkable. Cover embossing, through close cooperation and a degree of a gravure

letterpress, clip together the cover, to a certain pressure, so that the surface of the cover with letterpress or similar graphic patterns, the printed matter with a clear sense of relief. Coated plastic film cover is coated with adhesive, and the cover by heat and pressure bonded together to make it after processing technology. After coating the cover, due to the surface more than a layer of plastic film, smoother, and the gloss and color fastness and better, vibrant color graphics and rich three-dimensional, also has a waterproof, stain resistant, wear-resistant folding, corrosion-resistant features. These are the basic steps of the production of the cover.

?支架制作可以分为两个方面:

?一方面是烫金,借用一定压力和温度把烫印机上版,将金属铝箔或颜色铝箔按烫印模版的图形转印支架上。热压,主要应用于木质支架,用高密度优质木板作面层板,用人造板作芯层基材(二层结构的则为底层材),用低密度廉价板作底层板,在通用的热压机中进行压合,从而生成成本低廉,外观性能良好的支架材质。

?如果把日期作为一种资源,那么,制造日历是一个基于日期的能力需求计划。制造日历是一种明确表示工作日期、休息日期的日历,有时也称为工作日历。制造日历的作用有:作为考勤计算的依据;在MPS、MRP中基于提前期计算主生产计划、作业计划时用于确定开工日期、完工日期的依据;计算工作中心产能负荷时的日期基础;资金实现日期的认定。制造日历有两种类型,即单一制造日历和复杂制造日历。对于一个企业来说,无论是生产部门还是管理部门,无论是执行表面处理作业的工作中心还是完成产品装配作业的工作中心,都使用同一个制造日历,则这种企业的制造日历被称为单一制造日历。在一个企业中,由于环境条件限制例如能源消耗等、管理需要例如设备维修等,不同的部门、不同的工作中心有可能采用不同的生产日期和休息日期,从而具有不同的制造日历。则这种企业的制造日历被称为复杂制造日历。

?Stand production can be divided into two areas:On the one hand is tipping, to borrow a certain pressure and temperature on the version of the stamping machine, metal foil or aluminum foil by

stamping the template color graphics transfer bracket. Hot, mainly used in wood frame, high-quality timber with high-density surface layers, with plywood for the core layer substrate (two-story structure was the underlying material), with low-density low-cost board for the bottom plate, in general hot-pressing machine for laminated to produce low cost, good appearance and performance of the stent material.

?If the date as a resource, then the manufacture date on the calendar is the ability to demand a plan. Making it clear that the work calendar is a date, a break date calendar, sometimes referred to as the working calendar. The role of manufacturing calendar: as the basis for calculating attendance; in the MPS, MRP lead time calculation based on master production scheduling, work plan used to determine the start date, completion date basis; computing work center capacity load of the date of foundation; funds implementation dates identified. There are two types of manufacturing calendar, that calendar and create a single complex manufacturing calendar. For an enterprise, regardless of the production department or administration, whether it is to perform a surface treatment operation to complete product assembly work center or work center operations, are manufactured using the same calendar, the calendar of this enterprise is called a single manufacturing manufacturing calendar. In an enterprise, due to environmental constraints such as energy consumption, such as equipment maintenance management needs, different departments, different work centers may use different production date and the date of rest, which have different manufacturing calendar. This business is the manufacture of complex manufacturing calendar the calendar is called.?Calendar for the use of complex manufacturing

enterprises, different organizations have different levels of manufacturing calendar priority. At the lowest

organizational level work center with the highest priority manufacturing calendar, the highest level in the

organization of enterprises with the lowest priority of the manufacturing calendar. That is, if defined in a work center on the manufacturing calendar, then the work

center to use their own manufacturing calendar. If a work center does not define their own manufacturing calendar, then use the department's manufacturing calendar. If the department does not create the calendar, then the adoption of enterprise manufacturing work center calendar.

?Some people suggested to create the calendar in accordance with serial number order, so lead time calculations. Author believes that this proposal is

inappropriate. First of all, for a computer, whether by date or by number, calculate the lead time complexity is almost no difference; Secondly, if the number, then the calendar number resource management is a man of extra work.